Blog
Field notes: the vendor call that said "we're fine" three hours before the pass disagreedA supplier phoned in "we're fine." Three hours later a pass over the same roof told a different story. Notes on the gap that matters for allocation.
What is a disaster declaration, and why per-site checks don't waitA disaster declaration can take weeks and never names your supplier sites. Here's why control towers check hazard footprints per site instead.
Reconciling a supplier's damage report against a satellite site callHow to check a supplier's self-reported damage against an independent site call, and what to do when the two don't match.
Confirmed-loss vs. watch-list sites in supplier risk monitoringHow supply chain control towers and insurers sort named supplier sites into confirmed-loss, watch-list, and cleared after a flood, quake, or cyclone.
Field notes: the four hours between the eye and the first site listA field-notes look at the slow, uncertain hours after a storm's eye passes, before anyone knows which named supplier sites actually took the hit.
What GSD do you need to call a supplier site damaged?A breakdown of GSD tiers, from 3m regional imagery down to 0.5m VHR, and which one lets you call a supplier roof damaged.
Flood warning zone vs. flooded: how to tell the difference at the site levelA flood warning polygon tells you who might get wet. Here's how to tell which named supplier sites went under, within hours.
What is first notice of loss, and why a supplier site almost never files oneFNOL works when the damaged site is your policyholder. For a named supplier site, it usually never gets filed at all. Here's why.
Field notes: the two plants ten miles apart that the same storm treated like strangersA flooded plant and its dry neighbor ten miles away, same storm, show why proximity is the wrong proxy for which named sites took the hit.
What counts as visible damage in a satellite image of a supplier siteA guide to what RGB satellite imagery shows after a flood, quake or cyclone, and where a visual damage call stops.
How to Confirm a Supplier Site Sits Inside an Earthquake's Shaking ZoneA walkthrough on checking whether a named supplier site fell inside a quake's shaking footprint, and why intensity alone won't tell you if it's damaged.
What is a notification radius in supplier hazard monitoring?A notification radius flags supplier sites near a hazard's center. Here's how it works and where it falls short of a damage check.
How long does a field adjuster drive-out take after a regional disaster?What drives adjuster dispatch time after a catastrophe, and why the gap before a first damage report matters for supplier decisions.
Near miss vs. direct hit: reading a supplier site after a hurricaneHow to tell whether a named supplier site took a direct hit or a near miss after a hurricane, and why the warning area isn't the footprint.
Cyclone forecast cone vs. wind field footprint: what it means for supplier riskWhy the forecast cone and the actual wind swath answer different questions, and which one tells you which supplier sites got hit.
How to triage hundreds of supplier sites after a regional earthquakeA working method for sorting a large supplier site list into hit, maybe-hit and clear in the hours after a regional quake, without waiting on self-reports.
USGS PAGER alerts vs site-level damage checks for supply chain teamsUSGS PAGER gives a regional shaking estimate within minutes. Here's why supply chain teams still need a site-level damage check for named facilities.
What is a named supplier site list in supply chain risk management?What a named supplier site list is, how it differs from a supplier directory, and why it matters for event monitoring.